

up to 4 m3 of finished concrete, can be equipped with a loading skip, thus reducing the size of the concrete plant installation. The lifting assembly is equipped with two drums attached to the same shaft. The tension of the two strands of the cable connecting the two drums is balanced during lifting, if the load is off-center. The "fall arrester" block placed on the cable prevents the uncontrolled descent of the skip in the event of a cable break.